Kitchen Destruction Through Construction
Sequences (2005-09-10)
This is my favorite part. Here are three different "before/after"
sequences - with many stages in between. You can see just how things
evolved over time. Of course, nothings really done yet, so I'll be adding
more pictures to these sequences later. Enjoy!
First up is the "Hall Sequence". Here are a set of shots
taken from the front door, looking into the house. The pictures are:
- Before any destruction - before we even started the living
room
- After the living room was done, before kitchen
destruction started
- After the main kitchen-destruction-weekend
event
- After the final destruction - done at the start of the construction
weekend
- After the side-beam was constructed and installed
- After the joists were all in place
- After the sub-floor was installed

Next, we have the North-East corner sequence. These pictures are taken
from the West side of the living room looking towards the hallway to
the "new" house. The pictures are:
- Just Before the living-room destruction began
- After living room construction finished, before kitchen destruction
- The middle of the first day of kitchen destruction - the wall comes
down! (see another angle of that glorious even on the kitchen
destruction page)
- The end of the first day of kitchen destruction - all done but the
floor
- The end of the first weekend of kitchen construction - all the joists
are in
- The end of the last day of kitchen construction - sub-floor is in

Now, finally, for the main event! Be prepared for information overload!
I took a set of four pictures of the floor - looking at the NE, SE,
SW, and NW corners of the floor respectively (from left to right below)
after every major point in the kitchen destruction and construction
process. Below are the 8 sets I took. At 4 pictures a piece that's 32
pictures! They wouldn't fit very well on this page, so I shrunk the
set down to thumbnail sized. You can just click the picture (or here)
to see the full detail picture!
The 8 steps are:
- Before kitchen destruction
- After the first day of destruction
- After the second day of destruction
- After the first day of construction - studs and head in inner-East
wall installed, final destruction done
- After the second day of construction, center and side beams installed
- After the forth day of construction - all joists in, but ties and
a few other finishing touches not done
- After Ties and other finishing touches done
- After sub-floor was installed

|